Range 04 · Flooring

The flooring range.

Heavy-duty floor coatings for factories, warehouses and sport courts — plus road and car-park marking. Where foot traffic is heavy and wear is constant, this is the range.

High build epoxy floor coatingTwo-pack

High Build Epoxy

A two-pack epoxy floor coating for industrial and commercial concrete floors. Forms a seamless, chemical-resistant film that stands up to pallet traffic, forklifts and spillage.

Road marking paint being appliedRoad-grade

Road Marking

Chlorinated rubber road-marking paint. Fast-drying, reflective-bead compatible and specified on car-parks, factory aisles and secondary roads.

Tennis court surface coatingSport surface

Tennis Court

A cushioned acrylic sport-court coating system. Supplied with resurfacer, textured topcoat and line paint — everything you need for a regulation-green tennis or multi-sport surface.

Epoxy putty repairing a concrete floorCrack repair

Epoxy Putty

A two-pack epoxy filler for repairing concrete cracks, spalls and surface defects ahead of an epoxy floor coating. Cures rock-hard, sands flat and bonds permanently to a sound substrate.

Application

How it goes on.

Floor systems live or die on substrate preparation. Our technical team can visit site before you order.

Prep is 70% of the job.

Concrete must be cured, sound and free of laitance. Asphalt must be dust-free and dry. Sport courts need a level, textured base — rolled and rolled again.

For any flooring specification over 500 m² we strongly recommend a technical site visit before the epoxy is mixed.

  1. 1

    Mechanical prep

    Grind or shot-blast the concrete. Sweep and vacuum. Repair large cracks with epoxy mortar.

  2. 2

    Primer coat

    An epoxy primer coat keys the substrate for the high-build. Use the thinned first coat as a primer where a dedicated primer isn't specified.

  3. 3

    Mix & apply

    Mix Part A and Part B thoroughly. Apply within pot life. Roller or squeegee at the specified film build.

  4. 4

    Cure & line

    Allow 24 hrs light traffic, 48 hrs full cure. Then apply line marking if the system calls for it.

Factory floor, car-park or court? Let's survey it.

For any flooring project we can have a technical rep on site within 72 hours. Tell us the address, the area and what the surface does for a living — we'll come back with a system spec.